Francis Kendall Reserve Track Slip Mitigation
Project location
Auckland
Client
Auckland Council
Services provided by Frame Group
Solutioning, Concept Design and Visualisation
Detailed Design and Engineering
Construction Management
Partners
LandTech – Geotechnical
Arb Eco – Aborist
After multiple slips damaged the Francis Kendall Reserve track during Auckland’s extreme weather events, Frame Group was engaged to restore access and build long-term resilience into the site.
Working closely with geotechnical, arborist and archaeological specialists, we developed solutions that would both stabilise the slope and minimise further disruption to the sensitive environment. Our scope included new track alignments to bypass unstable areas, engineering retaining walls to support the terrain, and preparing detailed construction documentation to secure Council consents and fast-track delivery.