He Ara Kotahi Pathway (Palmerston North and Linton section)
Project location
Palmerston North, Manuwatu
Client
Palmerston North City Council
Services provided by Frame Group
Feasibility Studies and Options Assessment
Detailed Design and Engineering
Consents Management
Construction Management
Partners
Fulton Hogan Limited - Construction Contractor
Palmerston North City Council engaged Frame Group to design and contract manage the construction of new section of the He Ara Kotahi pathway a 2.9 km long shared cycling and walking trail between Dairy Farm Road in the Massey University Farm and Bells Road at Linton Camp in Palmerston North, Manawatu.
Project features:
Design of approximately 390m of 3m wide of track
Design of approximately 3.5km of 2.5m wide of track
Turitea bridge super structure: 36m long× 3.0m wide glulam bridge
Farm track overbridge superstructure: 36m long×2.5m wide glulam timber bridge
Greenwoods bridge: 10m long×2.5m wide glulam timber bridge
Design of approximately 70m of timber boardwalk
Kahuterawa Bridge: 45m long x 1.5m wide timber suspension bridge
Frame Group worked with OPUS International Consultants who designed the Turitea Bridge and Farm Track Overbridge substructure.